UConn FMRI Building Sidewalk Renovations

The project consisted of the removal and replacement of concrete sidewalks, stairs and retaining walls at the UConn FMRI Building.  One requirement of this project was that the building had to stay active and open during construction.

Work included:

  • Site work for the removal and disposal of the existing concrete
  • Site work for the new cast-in-place retaining walls, stairs and concrete walks
  • Grading and drainage
  • Replacement of granite curbing and bituminous pavement patching