South Windsor Doctor’s Office

This site had served as a stormwater detention area for a local retail development.  The detention area was removed and structural fill was imported to create the pad for the development of a 15,000 SQFT doctor’s office.

Work included:

  • Driveway and parking lot
  • Sewage pump station
  • Public water and utilities